Key points
- Start before handover: with dimensioned plans you can already decide the layout and furniture.
- Check sockets, light points and TV outlets before deciding where each piece will go.
- Check access (doors, stairs, lift) so large furniture can get in.
- Order what takes longest first: sofas, beds, wardrobes and outdoor furniture.
Buying a new-build home has a big advantage: you can plan the furniture calmly, before you have the keys. The downside is that, without being able to go inside, it's easy to get measurements, sockets or access wrong.
We've put together the steps we follow with our new-build clients in Fuerteventura and across the Canary Islands, in chronological order.
Stage 1: with the plans in hand
With this information you can already sketch a first furniture layout:
- Ask the developer for dimensioned plans of the property.
- Mark the orientation and views: they determine where the sofa, table or bed should go.
- Locate sockets, light points, TV outlets and air-conditioning vents.
- Define the overall style and the palette of colours and materials.
- Decide what each room is for: study, guest bedroom, play area…
Stage 2: layout and budget
Before choosing specific models, decide what goes in each room and how much space it takes. Leave comfortable walkways and check that wardrobe doors and drawers can open without hitting anything.
This is the ideal moment for renders: seeing the home furnished in 3D, at real dimensions, avoids most mistakes and makes it easier to agree.
Stage 3: choose and order by lead time
Not all furniture takes the same time. Much of it is made to order and lead times depend on each manufacturer, so order what takes longest first:
- Upholstered sofas and armchairs
- Beds, storage beds, headboards and mattresses
- Wardrobes, sideboards and dining furniture
- Outdoor furniture
- Lighting, mirrors, artwork and textiles, last
Stage 4: before handover
In the final weeks, practical details make all the difference:
- Check the real dimensions of the key rooms on site.
- Check access: door widths, stair turns, lift and entrance.
- Confirm the expected handover date with the developer.
- Schedule furniture delivery and assembly after the final clean.
- If the home is on another island, plan inter-island transport.
Stage 5: delivery, assembly and finishing touches
On delivery day, check every package before signing the delivery note and note any visible damage. Once the large pieces are assembled, it's time for the details: curtains, rugs, lamps, artwork and plants.
Leave textiles and decor until last: with the furniture in place, it's much easier to get sizes and colours right.
Frequently asked questions
When should I start choosing furniture for a new-build home?
Ideally a few months before handover, as soon as you have plans with measurements. That leaves time to decide calmly and for production lead times.
Can I plan the interior design without having been inside?
Yes. With dimensioned plans the home can be modelled in 3D and different layouts and pieces tried out before buying.
Which furniture should I order first?
Pieces that usually have the longest production times: upholstered sofas, beds and storage beds, wardrobes and outdoor furniture.
Do you deliver and assemble the furniture at the property?
Yes, we coordinate delivery and assembly on any of the Canary Islands. The cost is shown on the quote.
Shall we help with your project?
If you've just bought a new-build home, bring us the plans: we'll help you plan the furniture and see it in renders before handover.